Entering Hoshion
Enterprise Profile
Enterprise Culture
History
Market Distribution
Process
 
History

2007
·Company welfare of Apartment Fund was set up.
·Zhongshan Jeoshion Aluminium Co., Ltd was awarded High-New-Tech Enterprise by Guangdong Provencal Government
·New 4000㎡office building and Testing Center were put into use
·The 1800T extrusion was put into mass production
·The development of super fine structure material H601 and thick wall pipes was adopted into mass production successfully
2006
·The project of high purity, high refined, and high surface aluminium alloy pips for OPC drum gained the reward of   innovation fund for Technology Based Firms of the Science and Technology Department of State, and succeeded in  application for patent right.
·A new 16000m2 factory building was put into use
·Super hard H775 alloy was developed
·Hoshion (HK) Share Limited was renamed as Hoshion (HK) Aluminium Limited
2005
·Enterprise Resources Plan (ERP) software was put into operation
·Heat-resisting new M034 alloy was developed
·Zhongshan Jeoshion Aluminium Co., Ltd was established as subsidiary company of Hoshion (HK) Share Limited
    Great prize and honors was awarded to 6 employees who made contributions to factory
2004
·Extend shares of Hoshion (HK) Share Limited and increasing registered capital to HK$100 million
·The 3rd extension construction of workshop started up
2003
·Passed test of ISO9000:2000 Quality Management System Certification
·The 2nd extension of 4000m2 workshop was put into use
·A new melting and casting line, which included smelting furnace, holding furnace, degassing hydrogen system, porous tube filter, hot-top casting system, and homogenization oven were established
·880T double-motion indirect extrusion line for seamless pipes was put into use
2002
·Purchased 40000m2 industrial land  for workshop extension in Sanxiang town, Zhongshan
·Project of research and development material for OPC drum was set up
2001
·Two extrusion lines was set up in new extended 1000m2 workshop
2000
·Extended 3 workshops and the whole set of drawing machine was input from Taiwan
1999
·Hoshion (HK) Share Limited was set up and fully owned Zhongshan Hoshion Aluninium Factory
·660T extrusion line from Taiwan was equipped, and it’s the first time to enlarge profile capacity
1998
·8T melting and casting equipments was set up
1997
·450T extrusion line was set up in a rented of 2000m2 factory building, production began in April
1996
·The founders of Mr. Li jianxiang and Mr. Huang Can created Zhongshan Hoshion Aluminium Factory

Employment | Professional Knowledge | Contact | Bulletin Board Copyright@ 2004-2008 Hoshion All Rights Reserved.